The snow (and arctic cold conditions) have finally hit Northern Idaho. The cabin is now entirely inaccessible by Jeep until late Spring.
I've got some things to do up at the cabin site, however. I left 2/3 of the goat floor up there to be worked on, and I still need to attach the loft railing to the loft. I'll get started on those interior projects soon. The important exterior projects will have to wait until summer.
In the meantime, exciting things have been happening with my other timber framing project:
You can see more at:
http://pceiwriterstudio.blogspot.com
We're about to get started cutting joinery, and I'll try to document that a bit better than I did with the cabin. :-)
0 Comments:
Post a Comment
<< Home